What are the time-weighted average of metabolic rate and the total metabolic rate for this person

SFTY 631 – Fundamentals of Industrial Hygiene
Assignment 9

A bank teller’s daily tasks are as following:

Task #1: working at his/her desk (sitting) for 3:30 hours.
Task #2: attending the drive through customers for 1:50 hour.
Task #3: working at teller station (standing) for 1:30 hour.
Task #4: breaks for 30 minutes.
Task #5: lunch for 40 minutes.

Need assignment help for this question?

If you need assistance with writing your essay, we are ready to help you!

OUR PROCESS

Order

Payment

Writing

Delivery

Why Choose Us: Cost-efficiency, Plagiarism free, Money Back Guarantee, On-time Delivery, Total Сonfidentiality, 24/7 Support, 100% originality

Tasks 1 to 5 had metabolic rates of 1.1 kcal/min, 210 kcal/hr, 1.5 kcal/min, 20.931 w, and 34.885 w respectively. What are the time-weighted average of metabolic rate and the total metabolic rate for this person? (10 points)

 

A person works as a technical support technician in a company. He/she had a meeting with his/her supervisor and collected work orders from 8 am to 9 am. The temperature conditions in office was Tnwb = 62 oF and Tg = 78 oF. Then he/she drove half an hour to a customer’s location in a car with Tnwb, Tg and Tdb of 71, 88 and 87 oF respectively. From 9:30 am to 1:30 pm he/she provided services to the customer where Tnwb and Tg were 58 and 75 oF respectively. He/she had lunch in a fast food restaurant from 1:30 to 2:30 pm with Tnwb of 60 oF and Tg of 76 oF. After lunch he/she drove another half an hour back to office where Tnwb, Tg and Tdb were 71, 88 and 90 oF respectively. He/she completed the paperwork and met with another customer from 3 to 5 pm and Tnwb and Tg were 61 and 78 oF. Calculate the time-weighted average heat index for this person. (10 points)

 

 

 

 

 

 

Calculate the time-weighted average of heat index, ceiling limit, recommended exposure limit, recommended alter limit and total metabolic rate for a maintenance worker who has the following work schedule under the given conditions. (10 points)

Task Time Metabolic rate Tnwb Tg Tdb
Helping prod. Line to set-up machine 2 hr 183 kcal/hr 15.0 oC 26.0 oC –
Break 15 min 1.1 kcal/min 66.9 oF 84.2 oF 85.1 oF
Cleaning up a chemical overflow 1.5 hr 276 kcal/hr 67.1 oF 85.2 oF 86.8 oF
Lunch 30 min 0.3 kcal/min 15.1 oC 26.5 oC –
Repairing a fan on roof 3 hr 363 kcal/hr 70.0 oF 85.9 oF 88.9 oF
Break 15 min 1.2 kcal/min 15.0 oC 27.8 oC –
Lubricating the conveyor 1 hr, 30 min 211 kcal/hr 16.4 oC 28.1 oC –

 

Note 1 – Show your complete work for full credit.